Industrial Engineering & Manufacturing · Pulp & Paper
Productivity

+15%

increase in productivity

FocusOperational Excellence · Data and digitalizationTimelineDiagnostic 2 wks · Project 20 wks

Project objective: +10% in productivity

Results

+15%
Productivity
+500%
ROI
+11%
EBITDA
35%
Planning and adherence
-31%
Overtime
+28%
OTIF
+12%
Net sales
-5%
Maintenance cost
8 months
Payback

Context and challenge

A multi-site project in two countries: one plant needed to optimize resources and the other to increase capacity, both seeking higher profitability. Limited monitoring and control; planning and sequencing without constraint management, with replanning and low adherence; manual tools and reliance on spreadsheets; unclear agreements between Sales, Planning and Operations; overlapping responsibilities and overtime above benchmark.

Approach and impact

Governance and interfaces (RACI + stage gates)

A formalized RACI to eliminate overlaps; alignment of Sales and Operations through stage gates, production priorities and SLAs; an automated change flow in the S&OP.

Data and digitalization

A digitalization blueprint and systems integration into a BI platform, reducing Excel; automated reports and KPIs; digital visual management on the shop floor; integrated planning data for greater adherence.

Operational excellence

A revised and digitalized overtime authorization process; real-time performance monitoring; new daily shop-floor routines for more responsive decisions.

*Selected project result. Gains vary depending on context, maturity and scope.