Private Industrial Group · PVC-coated fabrics
Production

+30%

increase in production volume

FocusQuality · Losses · ProductivityTimelineDiagnostic 2 wks · Project 20 wks

Project objective: +20% in productivity

Results

+30%
Production volume
+350%
ROI
+18%
Net sales
+39%
Quality
+15%
OEE
80%
KPI automation
7 months
Payback

Context and challenge

A plant with two connected lines of PVC-coated fabrics, facing low demand and a high volume of complaints due to quality variability. High waste and daily production below potential pressured service and profitability. Operators changed formulations without formal criteria; outdated recipes and unclear SOPs; poor scheduling increased setups and waste; reports and meetings generated no insights, routines, standards and Data, Systems and AI applications were missing.

Approach and impact

Quality operating system

A daily cadence of KPI review with quality dashboards and root-cause analysis; formulation repeatability through short-interval control, updated SOPs and real-time parameter monitoring; procurement policies and formulation guidelines to reduce variability.

Data and digitalization

Operational and executive dashboards connected to the ERP, reducing spreadsheets; a streaming analytics platform to monitor formulations, machine alerts and automated statistical quality insights.

Production and planning

Planning redesign to optimize capacity, throughput and setups; critical SOPs (setup execution and raw-material inspection) reducing waste and stabilizing execution.

*Selected project result. Gains vary depending on context, maturity and scope.

Request a consultation